Bridgwater and Taunton Canal

Skip the page content navigation if you do not require links to content sections within this page.

Page Content Navigation

Skip the primary navigation if you do not want to read it as the next section.


Primary navigation

Skip the main content if you do not want to read it as the next section.


In 1949 the poor state of the Bridgwater and Taunton Canal was the subject of complaint. The following year IWA again pressed for the removal of restrictions on the locks and of the temporary low bridges that had been placed across the canal during the war.

In March 1955 the Board of Survey reported and recommended the disposal of 771 miles of waterway including some canals like the Huddersfield Narrow Canal and the Barnsley Canal that had already been abandoned and closed to traffic. These "Group 3" waterways also included the Ashton, Peak Forest, Macclesfield, Bridgwater and Taunton, Chesterfield, Cromford, Dearne and Dove, Erewash, Forth & Clyde, Grand Western, Grantham, Kennet & Avon, Lancaster, Manchester, Bolton & Bury, Monmouthshire & Brecon, Nottingham, Oxford (southern section), Pocklington, Ripon, Llangollen, Montgomery, Stratford-upon-Avon (southern section), Swansea and Edinburgh & Glasgow Union canals as well as the River Witham.

In response IWA advocate a National Waterway Conservancy to look after all our waterways and point out that it is cheaper to restore and use waterways than to eliminate them.

The Bridgwater and Taunton Canal was officially reopened in 1994 after 20 years of restoration work.

[Top]


The following page sections include static unchanging site components such as the page banner, useful links and copyright information. Return to the top of page if you want to start again.


Page Extras

Home | Our work | Support us

Skip the main banner if you do not want to read it as the next section.


Page Banner


End of page. You can return to the page content navigation from here.