Bugsworth Basin (Under Restoration)

Skip the page content navigation if you do not require links to content sections within this page.

Page Content Navigation

Skip the primary navigation if you do not want to read it as the next section.


Primary navigation

Skip the main content if you do not want to read it as the next section.


Bugsworth Basin

Photo: tuesdaynightclub.co.uk

Bugsworth Basin was fully reopened at Easter 2005 following more than thirty years of work by The Inland Waterways Protection Society Ltd, who adopted the unique canal and tramway interchange complex at Bugsworth Basin as its major project.  The more important and larger of two southern terminals of the Peak Forest Canal, Bugsworth Basin had initially re-opened amid much celebration six years earlier.  Unfortunately, the Society and BW had no option but to close the Basin again the following autumn due to excessive leakage and unacceptable water loss to the adjoining river Blackbrook.  Substantial works to provide a long-term solution to leakage problem were undertaken in 2004.  The Society’s volunteers continue to maintain the non-water areas for the benefit of all visitors and local residents, with the co-operation with English Heritage.



The following page sections include static unchanging site components such as the page banner, useful links and copyright information. Return to the top of page if you want to start again.


Page Extras

Home | Our work | Support us

Skip the main banner if you do not want to read it as the next section.


Page Banner


End of page. You can return to the page content navigation from here.